Monday, January 31, 2011

Tech Assignment

Metal

Tech Assignment Due Date : Feb. 8th Tuesday

Build a three-dimensional object that stands on its own. You are free to construct anything as long as it meets these minimum requirements.

2 rivets

1 foot of welding

Use all cutting methods

Three different surface textures

The materials required for this technical assignment will be salvaged from the scrap bin in the Sculpture driveway.

This is a quick technical assignment. So, don’t spend too much time thinking about what you want to build and try to work your ideas with the scraps that you are able to find in a more intuitive manner.

No comments:

Post a Comment